濟(jì)南廠房福音!大跨距橋架破解3大痛點(diǎn),加強(qiáng)筋加,安裝省一半錢
濟(jì)南廠房福音!大跨距橋架破解3大痛點(diǎn),加強(qiáng)筋加,安裝省一半錢
Jinan factory gospel! Cracking 3 major pain points for large-span bridge frames, adding free reinforcing bars, and saving half of the installation cost
在濟(jì)南做廠房、車間工程的朋友,幾乎都被電纜橋架安裝難住過:廠房寬度大,動輒十幾米、幾十米,用常規(guī)2米橋架拼接,接頭一大堆,不僅安裝麻煩,還存在極大隱患,稍微承重不均就容易變形、脫落;更頭疼的是,安裝成本居高不下,人工+材料算下來,每米成本比預(yù)想的高出不少,想省成本又怕不,陷入兩難。今天就給濟(jì)南工程人、廠房老板們,一個解決方案——濟(jì)南大跨距電纜橋架,做加強(qiáng)筋處理,不用多花一分錢,還能隨意定制尺寸、材質(zhì),徹底破解成本高、連接不、適配性差的三大痛點(diǎn),用大白話+實(shí)打?qū)嵉臄?shù)據(jù),嘮透它的優(yōu)勢,看完再也不用為橋架安裝犯愁。
Friends who work in factories and workshops in Jinan have almost always found it difficult to install cable trays: the width of the factory building is large, often tens of meters or even tens of meters. Using conventional 2-meter cable trays for splicing and a large number of joints not only makes installation difficult, but also poses great safety hazards. Even slight uneven load-bearing can easily cause deformation and detachment; What's even more troublesome is that the installation cost remains high, and the cost per meter for labor and materials is much higher than expected. We are caught in a dilemma of wanting to save costs but fearing safety. Today, I would like to recommend a perfect solution to the engineers and factory owners in Jinan - Jinan large-span cable tray. We offer free reinforcement treatment, which allows you to customize the size and material without spending a penny. This completely solves the three major pain points of high cost, unsafe connection, and poor adaptability. With plain language and solid data, we will explain its advantages and no longer have to worry about the installation of the cable tray.
先給大家說個濟(jì)南本地廠房的真實(shí)案例:章丘某大型機(jī)械廠房,寬度22米,初期計劃用常規(guī)2米橋架拼接,算下來需要11節(jié)橋架、10個接頭,不僅采購成本約8800元(按常規(guī)2米橋架80元/米計算),人工安裝費(fèi)還要4500元,總費(fèi)用超1.3萬元;而且多個接頭拼接,監(jiān)理驗(yàn)收時明確提出隱患,要求整改。后來換成濟(jì)南大跨距橋架,定制6米長規(guī)格,僅需4節(jié)就能覆蓋整個廠房寬度,接頭減少70%,總采購+安裝成本僅7600元,直接節(jié)省5400元,還一次性通過驗(yàn)收,后期運(yùn)行也沒有出現(xiàn)任何變形、松動問題。
First, let me give you a real case of a local factory in Jinan: a large mechanical factory in Zhangqiu, with a width of 22 meters, initially planned to use conventional 2-meter cable trays for splicing. After calculation, it requires 11 cable trays and 10 joints. The procurement cost is about 8800 yuan (calculated at 80 yuan/meter for conventional 2-meter cable trays), and the labor installation cost is also 4500 yuan, with a total cost of over 13000 yuan; Moreover, multiple joints are spliced together, and safety hazards are clearly identified during the supervision and acceptance, requiring rectification. Later, it was replaced with a large-span bridge in Jinan and customized to a length of 6 meters. Only 4 sections were needed to cover the entire width of the factory, reducing the number of joints by 70%. The total procurement and installation cost was only 7600 yuan, saving 5400 yuan directly. It also passed the acceptance inspection in one go, and there were no deformation or loosening problems during later operation.
先說說大家關(guān)心的痛點(diǎn)——2米橋架連接不,這也是濟(jì)南廠房工程常遇到的隱患。常規(guī)2米橋架,每拼接一次就多一個接頭,接頭處的承重能力會下降30%以上,而濟(jì)南廠房大多需要敷設(shè)重型電力電纜,每米電纜重量可達(dá)15-20kg,拼接處長期承重,很容易出現(xiàn)松動、變形,甚橋架脫落,引發(fā)電纜破損、短路等事故。據(jù)濟(jì)南建筑行業(yè)統(tǒng)計,廠房橋架事故中,68%都是因?yàn)槌R?guī)短跨距橋架拼接過多、接頭松動導(dǎo)致的,每年因這類隱患整改的廠房超300家。
First, let's talk about the pain point that everyone is most concerned about - the unsafe connection of 2-meter bridge frames, which is also the most common hidden danger encountered in Jinan factory construction. Conventional 2-meter cable trays have an additional joint every time they are spliced, which reduces the load-bearing capacity of the joint by more than 30%. However, most factories in Jinan require the laying of heavy-duty power cables, with a weight of up to 15-20kg per meter. The long-term load-bearing capacity of splices can easily lead to loosening, deformation, and even bridge frame detachment, causing safety accidents such as cable damage and short circuits. According to statistics from the construction industry in Jinan, 68% of safety accidents in factory bridge frames are caused by excessive splicing and loose joints in conventional short span bridge frames. Over 300 factories are rectified annually due to such hidden dangers.
而濟(jì)南大跨距電纜橋架,核心的優(yōu)勢就是“跨距大、連接少、更”,再加上加強(qiáng)筋處理,性直接拉滿。它打破常規(guī)2米橋架的局限,可定制1-12米任意長度,其中3米、6米、8米是濟(jì)南廠房常用的規(guī)格,占大跨距橋架市場用量的82%。比如20米寬的廠房,用6米長橋架,僅需4節(jié)就能完成敷設(shè),接頭數(shù)量比2米橋架減少60%以上,接頭越少,隱患就越小,徹底解決拼接不的問題。
The core advantage of Jinan's large-span cable tray is that it has a large span, fewer connections, and is safer. In addition, with free reinforcement treatment, the safety can be directly increased. It breaks the limitations of conventional 2-meter cable trays and can be customized to any length of 1-12 meters. Among them, 3 meters, 6 meters, and 8 meters are the most commonly used specifications in Jinan factories, accounting for 82% of the market usage of large-span cable trays. For example, in a 20 meter wide factory building, a 6-meter long bridge can be laid in just 4 sections, reducing the number of joints by more than 60% compared to a 2-meter bridge. The fewer joints there are, the smaller the safety hazards, completely solving the problem of unsafe splicing.
強(qiáng)調(diào):所有濟(jì)南大跨距橋架,均做加強(qiáng)筋處理,不加任何額外費(fèi)用!加強(qiáng)筋采用與橋架同材質(zhì)的加厚板材,厚度≥2.0mm,間距≤50cm,均勻焊接在橋架底部和兩側(cè),能讓橋架的承重能力提升50%以上,常規(guī)6米長大跨距橋架,不加加強(qiáng)筋時每米承重120kg,加完加強(qiáng)筋后,每米承重可達(dá)180kg以上,即使敷設(shè)多根重型電纜,也不會變形、下垂,跨距8米時撓度≤L/400(L為跨距),完全符合國標(biāo)要求,濟(jì)南多數(shù)廠房、車間都能放心使用。
Key emphasis: All large-span bridge frames in Jinan are reinforced with reinforcement bars free of charge, without any additional fees! The reinforcing ribs are made of thickened plates of the same material as the bridge, with a thickness of ≥ 2.0mm and a spacing of ≤ 50cm. They are evenly welded at the bottom and both sides of the bridge, which can increase the load-bearing capacity of the bridge by more than 50%. For a conventional 6-meter long span bridge, the load-bearing capacity per meter is 120kg without reinforcing ribs. After adding reinforcing ribs, the load-bearing capacity per meter can reach more than 180kg. Even if multiple heavy-duty cables are laid, they will not deform or sag. The maximum deflection at a span of 8 meters is ≤ L/400 (L is the span), which fully meets the national standard requirements. Most factories and workshops in Jinan can use it with confidence.
再說說第二個核心痛點(diǎn)——安裝成本高,濟(jì)南大跨距橋架能幫大家省不少錢,這筆賬咱們算得明明白白。是材料成本,常規(guī)2米橋架,加上接頭、連接件,每米綜合成本約80-100元,而濟(jì)南大跨距橋架,定制6米規(guī)格,每米綜合成本僅65-85元,比常規(guī)橋架每米節(jié)省15-25元,100米布線就能節(jié)省1500-2500元;其次是人工成本,常規(guī)2米橋架,每10米需要2名工人安裝1天,人工成本約300元,而大跨距橋架接頭少、安裝快,每10米僅需1名工人安裝1天,人工成本節(jié)省50%,100米布線可節(jié)省1500元以上。
Speaking of the second core pain point - high installation costs, Jinan's large-span bridge can help everyone save a lot of money, and we can calculate this account clearly. Firstly, there is the material cost. For a conventional 2-meter bridge, with the addition of joints and connectors, the overall cost per meter is about 80-100 yuan. However, for a large-span bridge in Jinan, with a customized 6-meter specification, the overall cost per meter is only 65-85 yuan, saving 15-25 yuan per meter compared to a conventional bridge. A 100 meter wiring can save 1500-2500 yuan; Secondly, there is the labor cost. For a conventional 2-meter bridge, 2 workers are required to install every 10 meters for 1 day, with a labor cost of about 300 yuan. However, for large-span bridge with fewer joints and faster installation, only 1 worker is needed to install every 10 meters for 1 day, saving 50% of labor costs. Wiring 100 meters can save more than 1500 yuan.
除此之外,濟(jì)南大跨距橋架的適配性極強(qiáng),徹底解決廠房寬度大、規(guī)格不匹配的問題。不管你的濟(jì)南廠房寬度是10米、20米,還是30米,都能定制對應(yīng)長度的橋架,1-12米隨意選擇,不用拼接或少拼接,既能適配不同寬度的廠房,又能減少后期維護(hù)成本——常規(guī)2米橋架接頭多,每年維護(hù)接頭需要花費(fèi)不少人工,而大跨距橋架接頭少,每年維護(hù)成本可節(jié)省60%以上,使用壽命也更長,常規(guī)橋架使用壽命約10-15年,大跨距橋架加加強(qiáng)筋后,使用壽命可達(dá)15-20年。
In addition, the adaptability of Jinan large-span bridge is extremely strong, completely solving the problem of large factory width and mismatched specifications. No matter if the width of your Jinan factory building is 10 meters, 20 meters, or 30 meters, you can customize the corresponding length of bridge frame. You can choose 1-12 meters freely without splicing or fewer splicing, which can adapt to different widths of factories and reduce maintenance costs in the later stage. Conventional 2-meter bridge frames have many joints, which require a lot of labor to maintain each joint every year, while large-span bridge frames have fewer joints, which can save more than 60% of annual maintenance costs and have a longer service life. The service life of conventional bridge frames is about 10-15 years, and after adding reinforcement to large-span bridge frames, the service life can reach 15-20 years.
材質(zhì)方面,濟(jì)南大跨距橋架也支持定制,不銹鋼、鍍鋅、熱浸鋅等各種材質(zhì)都能選,適配濟(jì)南不同廠房環(huán)境,也很合理。其中熱浸鋅材質(zhì)受濟(jì)南廠房青睞,占比達(dá)65%,鋅層厚度≥65μm,鹽霧測試≥720小時,能抵御廠房內(nèi)的粉塵、潮濕,每米約70-90元;不銹鋼材質(zhì)適配腐蝕性較強(qiáng)的廠房(比如化工、電鍍廠房),每米約120-180元;鍍鋅材質(zhì)性價比,每米約65-80元,適配普通機(jī)械、電子廠房,大家可根據(jù)自己的廠房場景靈活選擇,均支持定制。
In terms of materials, Jinan large-span bridge also supports comprehensive customization, with various materials such as stainless steel, galvanized, hot-dip galvanized, etc. to choose from, suitable for different factory environments in Jinan, and the price is also very reasonable. Among them, hot-dip zinc material is most favored by Jinan factory buildings, accounting for 65%. The zinc layer thickness is ≥ 65 μ m, and the salt spray test is ≥ 720 hours. It can resist dust and moisture in the factory building, and the price per meter is about 70-90 yuan; Stainless steel material is suitable for factories with strong corrosiveness (such as chemical and electroplating factories), with a price of about 120-180 yuan per meter; Galvanized material has the highest cost-effectiveness, with a price of about 65-80 yuan per meter, suitable for ordinary mechanical and electronic factories. Everyone can flexibly choose according to their own factory scene, and all support free customization.
補(bǔ)充一組濟(jì)南本地實(shí)用數(shù)據(jù),幫大家參考:濟(jì)南大跨距橋架,常規(guī)寬度50-1200mm、高度40-400mm,厚度1.5-3.0mm,定制周期僅3-5天,不耽誤廠房施工工期;安裝效率比常規(guī)2米橋架提升40%,100米布線,常規(guī)橋架需要5天完成,大跨距橋架僅需3天就能完成;后期電纜故障率可降低75%,檢修效率提升50%,長期來看,能為濟(jì)南廠房老板節(jié)省不少維護(hù)成本。
Add a set of local practical data in Jinan for reference: Jinan large-span bridge, with a conventional width of 50-1200mm, height of 40-400mm, thickness of 1.5-3.0mm, customization cycle of only 3-5 days, does not delay the construction period of the factory building; The installation efficiency is 40% higher than that of conventional 2-meter cable trays. For 100 meter wiring, conventional cable trays can be completed in 5 days, while large-span cable trays can be completed in only 3 days; The cable failure rate in the later stage can be reduced by 75%, and the maintenance efficiency can be improved by 50%. In the long run, it can save a lot of maintenance costs for the Jinan factory owner.
總結(jié)來說,濟(jì)南大跨距電纜橋架,就是為解決廠房橋架安裝痛點(diǎn)而生的——加加強(qiáng)筋,解決2米連接不的問題;1-12米隨意定制,適配各種寬度的廠房;多種材質(zhì)可選,性價比拉滿,材料+人工雙重省錢,安裝更、使用更省心。不管你是濟(jì)南章丘、高新區(qū)的機(jī)械廠房,還是長清、濟(jì)陽的化工、電子廠房,只要遇到橋架安裝成本高、廠房寬度大、連接不的問題,選濟(jì)南大跨距橋架,就能一次性破解所有難題,花少的錢,做、省心的布線工程,有需求的朋友,可直接聯(lián)系濟(jì)南本地廠家,一對一定制適配方案~
In summary, the large-span cable tray in Jinan was designed to address the pain points in the installation of factory cable trays - by adding reinforcing bars to solve the problem of unsafe 2-meter connections; Customized 1-12 meters, suitable for factories of various widths; Multiple materials are available for selection, with full cost-effectiveness. The combination of materials and labor saves money, making installation more efficient and usage more worry free. No matter if you are a mechanical factory in Zhangqiu and High tech Zone of Jinan, or a chemical and electronic factory in Changqing and Jiyang, as long as you encounter problems such as high installation cost of cable trays, large width of the factory, and unsafe connections, choosing Jinan large-span cable trays can solve all problems at once, spend the least money, and do the safest and most worry free wiring engineering. Friends who have needs can directly contact local manufacturers in Jinan for a one-to-one customized adaptation solution
下一篇:濟(jì)南人避坑!橋架≠線槽,90%工程人都搞混,一字之差差千里
相關(guān)文章 / Recommended news
- 濟(jì)南廠房福音!大跨距橋架破解3大痛點(diǎn),加強(qiáng)筋加,安裝省一半錢
- 山東工程人警惕!橋架敷線踩這坑必返工,監(jiān)理當(dāng)場叫停,國標(biāo)早有明確規(guī)定
- 濟(jì)南人避坑!橋架≠線槽,90%工程人都搞混,一字之差差千里
- 避坑指南!山東電纜橋架規(guī)格別瞎選,偏大浪費(fèi)偏小隱患大,國標(biāo)早就定好了
- 濟(jì)南人必看!鋁合金電纜橋架選對厚度,耐用又省心,90%的人選錯踩坑
- 山東人必看!電纜橋架不是“鐵架子”,藏著建筑用電的密碼,90%的人都不懂
- 800kg/m抗壓!濟(jì)南電纜橋架,破解3大工程痛點(diǎn),工期省30%
- 3種類型+98%散熱!山東電纜橋架,選對不踩坑,布線效率翻倍
- 2類核心支架!濟(jì)南電纜橋架,抗震承重雙達(dá)標(biāo)
- 別再混淆!山東電纜橋架vs線槽,6大核心區(qū)別一文分清
陽極氧化鋁合金橋架
托盤式電纜橋架
梯式電纜橋架
梯式不銹鋼電纜橋架
深灰色金屬防火電纜橋架


