電纜橋架的安裝程序是什么
電纜橋架的安裝程序:
Installer of the cable bridge:
1.測量定位,安裝橋架的支架,經檢查確認,才能安裝橋架;
Measuring location, mounting bracket of bridge, checking to confirm, to install bridge.
2.橋架安裝檢查合格,才能敷設電纜;
The bridge will be installed and checked to make the cable.
3.電纜敷設前絕緣測試合格,才能敷設;
The cable shall be qualified before the installation of the insulation test.
4.電纜電氣交接試驗合格,且對接線去向、相位和防火隔堵措施等檢查確認,才能通電。
The electric cable electric transfer test is qualified, and the connection, phase and fire isolation measures are checked and confirmed to be connected.
只有在安裝程序對的時候才可以保證產品的質量發揮到高點。公司服務于客戶,以質量上乘、合理和完善的售后服務與客戶攜手奮進,共同發展。質量保證,歡迎咨詢洽談。
Only when the installer is correct is the quality of the product to the highest. The company serves the customers in all aspects, with the best quality, reasonable price and perfect after-sales service to work together with the customers to develop together. Quality assurance, welcome consultation.
上一篇:電纜橋架的產品設計構造與結構分析
下一篇:什么環境下用全封閉電纜橋架
下一篇:什么環境下用全封閉電纜橋架
相關文章 / Recommended news
- 濟南廠房福音!大跨距橋架破解3大痛點,加強筋加,安裝省一半錢
- 山東工程人警惕!橋架敷線踩這坑必返工,監理當場叫停,國標早有明確規定
- 濟南人避坑!橋架≠線槽,90%工程人都搞混,一字之差差千里
- 避坑指南!山東電纜橋架規格別瞎選,偏大浪費偏小隱患大,國標早就定好了
- 濟南人必看!鋁合金電纜橋架選對厚度,耐用又省心,90%的人選錯踩坑
- 山東人必看!電纜橋架不是“鐵架子”,藏著建筑用電的密碼,90%的人都不懂
- 800kg/m抗壓!濟南電纜橋架,破解3大工程痛點,工期省30%
- 3種類型+98%散熱!山東電纜橋架,選對不踩坑,布線效率翻倍
- 2類核心支架!濟南電纜橋架,抗震承重雙達標
- 別再混淆!山東電纜橋架vs線槽,6大核心區別一文分清
陽極氧化鋁合金橋架
托盤式電纜橋架
梯式電纜橋架
梯式不銹鋼電纜橋架
深灰色金屬防火電纜橋架