電力電纜排管質量缺陷與防治詳解

山東電纜橋架廠家給大家整理了電力電纜排管質量缺陷與防治方法,希望那個對大家有所幫助!
Shandong Cable Bridge Frame Manufacturer has sorted out the quality defects and prevention methods of power cable piping, hoping that it will be helpful to you all! 
1.問題:基槽開挖內部積水
1. Problem: Water accumulation in foundation trench excavation
隱患:基坑積水浸泡后,地基土質變軟,承載力降低其,引起管渠基礎下沉,造成管渠結構折裂損壞
Hidden danger: After the foundation pit is immersed in water, the foundation soil becomes soft and the bearing capacity decreases, which causes the subsidence of the foundation of the pipeline and canal, and causes the fracture and damage of the structure of the pipeline and canal.
原因分析:1)自然降水或其它落水流進基槽,造成積水;
Reason analysis: 1) Natural precipitation or other falling water flows into the foundation trough, causing water accumulation;
2)地下水、滯水,未采取排降、降水措施
2) Groundwater, stagnant water, no drainage and precipitation measures
預防措施:1)雨季施工,須將基槽周邊開挖排水溝,防止落水流入槽內;
Preventive measures: 1) In rainy season construction, drainage ditches should be excavated around the foundation trench to prevent water falling into the trench;
2)排水溝應接通原排水管網,開槽宜在枯水期施工;
2) Drainage ditches should be connected to the original drainage network, and grooving should be constructed in dry season.
3)在地下水位以下或有淺層滯水地段挖槽,應采用排水溝、集水井、井點排降水措施;
3) Drainage ditches, catchment wells and well-point drainage measures should be adopted to dig ditches below the groundwater level or in shallow water-holding areas.
4)按照設計要求做好放坡施工
4) Sloping construction according to design requirements
山東電纜橋架
2.問題:排管不整齊,回填不規范
2. Problem: Unorderly drainage and irregular backfilling
隱患:管道擠壓變形,降低使用壽命
Hidden danger: pipe extrusion deformation, reduce service life
原因分析:1)未按照設計、規范施工;
Reason analysis: 1) Failure to comply with design and specification of construction;
2)回填土用雜物回填
2) Sundries Backfilling for Backfilling
3)質量管理不到位,工程驗收不細致。
3) The quality management is not in place and the project acceptance is not meticulous.
預防措施:1)嚴格按照作業指導書、規范施工
Preventive measures: 1) Construction in strict accordance with operation instructions and specifications
2)按規范整齊安裝排管,并進行固定;
2) Install and fix the pipes neatly according to the specifications;
3)回填前應坑內積水、雜物等,回填土應每300mm夯實一次,后必須培出高于地面300mm的防沉層
3) Water and debris in the pit should be removed before backfilling. The backfill should be compacted every 300 mm. Finally, the Anti-subsidence layer 300 mm above the ground must be cultivated.
好了,今天的內容就先給大家介紹到這里了,收藏山東電纜橋架廠家官網:http://www.zkhtkj.cn,可以了解更多詳細信息!
Okay, today's content will be introduced to you first, collect the official website of Shandong Cable Bridge Manufacturer: http://www.zkhtkj.cn, you can learn more details!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 欧美黄色片 一级片 | 亚洲爽视频 | 欧美精品91 | 亚洲国产精久久久久久久春色 | 色8久久 | 欧美日韩在线成人 | 亚洲精品大全 | 国产亚洲欧美另类一区二区三区 | 在线日韩欧美 | 久久精品精品 | 久9视频这里只有精品8 | 国产欧美一区二区 | 国产成人久久精品一区二区三区 | 桃花综合久久久久久久久久网 | 久久久www成人免费精品 | 国产精品爽爽久久久久久 | 亚洲一区电影 | 国产午夜电影 | 欧美视频一区二区三区四区 | 久久无码精品一区二区三区 | 色花堂的网站地址 | 免费成人小视频 | 欧美成人精品一区 | 伊人伊人伊人 | 国产精品久久久久久久久免费高清 | 成人网18免费网站在线 | 香蕉久久av一区二区三区 | 久久国产欧美日韩精品免费 | 欧美日韩在大午夜爽爽影院 | 日韩伦理电影免费在线观看 | 国产精品xxxav免费视频 | 欧美大片在线欧美大片 | 日韩一区二区三区av | 久久av资源网 | 精品一精品国产一级毛片 | 久久综合狠狠综合久久综合88 | 日本免费一区二区视频 | 日本一道人妻无码一区在线 | 精品网站| 欧美精品一区二区三区四区五区 | 人人澡人人澡人人 |