四虎最新影院 I 美女一区二区在线观看 I av不卡在线看 I 冲田杏梨 av作品在线 I 亚洲爆乳无码专区 I 特大色一区 I av综合av I 成人在线视频中文字幕 I 日韩精品免费在线视频 I 一级片黄色大片 I 99久久久无码国产精品试看 I 国内黄色小视频 I 91亚洲视频在线观看 I a久久久久久 I 午夜爽爽爽男女免费观看hd I 欧美 成人 亚洲 动漫 另类 I 四虎影院2019 I 肉耽高h男男1v1 I 成年片黄色日本大片网站视频 I 亚洲小说综合网 I 污的网站 I 波多野结衣中文字幕久久 I 又粗又猛又大爽又黄老大爷5 I 国产日产suv精品一区二区6 I 最新国产成人无码久久 I 欧美日韩一区二区精品 I 国产一区内射最近更新 I 巨粗进入警花哭喊求饶在线观看 I 污污网站观看 I 69国产精品成人 I 天堂а√中文最新版在线 I 2019精品视频 I 高贵麻麻被调教成玩物 I 精品国产精品网麻豆系列 I 韩国午夜小视频

網站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

廠家詳解橋架和配線架的線纜整理技巧

  目前,山東橋架在建筑電力行業非常受歡迎,隨著其應用范圍的不時推行,越來越多的人選擇裝置該橋架,并對其越來越注重,關于橋架和配線架的線纜整理辦法大家曉得嗎?今天,濟南電纜橋架廠在下文為大家引見一下。
  At present, Shandong bridge is very popular in the construction power industry. With the application of the bridge from time to time, more and more people choose to install the bridge, and pay more and more attention to it. Do you know the cable arrangement methods of the bridge and distribution frame? Today, Jinan cable bridge factory is here to introduce you.
  先要整理橋架上的線纜:普通狀況下,整理樓層橋架中的線纜并不是很艱難,只需直接順著它的方向理順整理即可,不需停止捆扎。另外,主干橋架中的線纜則需求運用扎帶停止簡單的捆扎,用來區別不同的樓層,并減少重力拉伸線纜,從而防止改動橋架物理屬性(絞合度、長度等)和電氣性能。
濟南電纜橋架
  First, the cables on the bridge should be sorted out: under normal conditions, it is not very difficult to sort out the cables in the floor bridge, just straighten out the cables in its direction, without stopping binding. In addition, the cables in the trunk bridge need to stop simple bundling with ties to distinguish different floors, and reduce the gravity tension of the cables, so as to prevent changes in the physical properties (stranding, length, etc.) and electrical performance of the bridge.
  橋架
  Bridge frame
  其次是如何整理配線架中的線纜,這局部需求細分為兩小節:
  Secondly, how to sort out the cables in the distribution frame is divided into two sections:
  1、整理前面板線纜
  1. Arrange the front panel cable
  假如交流機與配線架位于同一機柜中,則只需選擇恰當長度的跳線,將跳線打個環后置于理線器中。
  If the AC machine and distribution frame are located in the same cabinet, only the jumper of appropriate length should be selected, and the jumper should be placed in the wire manager after looping.
  然后,兩端分別銜接交流機和配線架端口,一切銜接都完成后,蓋上理線器的蓋板即可,假如配線架與交流機位于不同的機柜,那么需求運用較長的跳線需求對跳線停止整理。除了配線架和交流機的前面板需求運用理線器對線纜停止整理外,垂直局部也應當運用垂直理線器停止整理。
  Then, the two ends are connected to the port of the AC machine and the distribution frame respectively. After all the connections are completed, cover the cover plate of the cable manager. If the distribution frame and the AC machine are located in different cabinets, long jumpers are required to be used to stop the arrangement of jumpers. In addition to the front panel of the distribution frame and the AC machine, the cable manager shall be used to stop the cable sorting, and the vertical part shall also be used to stop the sorting.
  2、整理后部線纜
  2. Arrange the rear cable
  配線架后部集中著網絡布線系統中的一切程度布線,因而有大量的線纜需求整理。在通常狀況下,每一個配線架中的線纜在理順之后,應當運用尼龍扎帶依次捆扎固定。
  At the back of the distribution frame, there are all levels of cabling in the network cabling system, so there is a large number of cable needs to be sorted out. In general, the cables in each distribution frame shall be tied and fixed in turn with nylon ties after being straightened out.
  橋架
  Bridge frame
  程度線纜的捆扎固定方向應當左右交替,以便于垂直局部固定在機柜兩側。然后,再將一切垂直局部線纜依次捆扎固定在機柜的兩側。在捆扎固定線纜時,應當留意不要過火折彎雙絞線,并且扎帶不要扎得過緊,以免影響線纜的電氣性能。
  The binding and fixing direction of the cable shall be left and right alternately to facilitate the vertical partial fixation on both sides of the cabinet. Then, tie and fix all vertical local cables on both sides of the cabinet in turn. When binding and fixing the cable, pay attention not to bend the twisted pair too much, and do not tie the cable too tightly to avoid affecting the electrical performance of the cable.
  上述就是濟南電纜橋架廠為大家引見的山東橋架和配線架的線纜整理技巧,置信大家看完之后對橋架有了進一步的理解和認知,希望以上內容能對大家有所協助,想理解更多詳情,歡迎訪問網站:http://www.zkhtkj.cn
  The above is the cable arrangement skills of Shandong cable tray and distribution frame introduced by Jinan cable tray factory for you. I believe you have a further understanding and cognition of the cable tray after reading it. I hope that the above content can help you. If you want to understand more details, please visit the website: http://www.zkhtkj.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318