四虎最新影院 I 美女一区二区在线观看 I av不卡在线看 I 冲田杏梨 av作品在线 I 亚洲爆乳无码专区 I 特大色一区 I av综合av I 成人在线视频中文字幕 I 日韩精品免费在线视频 I 一级片黄色大片 I 99久久久无码国产精品试看 I 国内黄色小视频 I 91亚洲视频在线观看 I a久久久久久 I 午夜爽爽爽男女免费观看hd I 欧美 成人 亚洲 动漫 另类 I 四虎影院2019 I 肉耽高h男男1v1 I 成年片黄色日本大片网站视频 I 亚洲小说综合网 I 污的网站 I 波多野结衣中文字幕久久 I 又粗又猛又大爽又黄老大爷5 I 国产日产suv精品一区二区6 I 最新国产成人无码久久 I 欧美日韩一区二区精品 I 国产一区内射最近更新 I 巨粗进入警花哭喊求饶在线观看 I 污污网站观看 I 69国产精品成人 I 天堂а√中文最新版在线 I 2019精品视频 I 高贵麻麻被调教成玩物 I 精品国产精品网麻豆系列 I 韩国午夜小视频

網站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

槽式電纜橋架可用于全封閉電纜敷設嗎?

  電纜橋架是由橋架或梯子的直線段、彎曲通道、構件與支撐臂(臂式托架)、吊架等組成的具有密集支撐索的剛性結構體系的全稱。槽型電纜橋架是由全鋼板彎曲成槽型的部件,其概念和槽型電纜橋架之間的區別是高度不同,寬度比不同,槽型電纜橋架又淺又寬,槽型電纜橋架有一定的深度和閉合度。
  Cable bridge is the full name of the rigid structure system with dense supporting cables, which is composed of the straight section, bending channel, member, supporting arm (arm bracket), hanger, etc. of the bridge or ladder. Trough type cable tray is a kind of component bent from all steel plates into trough type. The difference between its concept and trough type cable tray is that the height is different, the width ratio is different, the trough type cable tray is shallow and wide, and the trough type cable tray has a certain depth and closure.
  槽式電纜橋架可用于全封閉電纜敷設。更適用于高敏感系統的計算機電纜、通信電纜、熱電偶電纜等控制電纜的敷設。對控制電纜的屏蔽干擾和電纜在重腐蝕環境中的保護效果良好。
  Trough type cable tray can be used for fully enclosed cable laying. It is most suitable for laying computer cables, communication cables, thermocouple cables and other control cables in highly sensitive systems. The shielding interference of the control cable and the protection effect of the cable in the heavy corrosion environment are good.
山東電纜橋架
  通道式電纜橋架接地點:
  Channel type cable tray grounding point:
  1. 電橋系統應具有可靠的電氣連接和接地(僅適用于金屬電橋)。
  1. The bridge system shall have reliable electrical connection and grounding (only applicable to metal bridge).
  2. 當允許橋接系統構成接地主電路時,應滿足下列要求。電橋兩端連接電阻不大于0.00033歐姆,并絕緣涂層的接地孔。在中性點1KV及以下的直接接地系統中,接收設備的接地與系統的中性點接地連接。電源站安裝動態切斷時,橋步長方向的金屬截面積不得小于規定值。
  2. When the bridge system is allowed to form the ground main circuit, the following requirements shall be met. The connection resistance at both ends of the bridge shall not be greater than 0.00033 ohm, and the grounding hole of the insulating coating shall be removed. In the direct grounding system with the neutral point of 1kV and below, the grounding of the receiving equipment is connected with the neutral point of the system. When the power station is installed with dynamic cut-off, the metal cross-sectional area in the direction of bridge step length shall not be less than the specified value.
  3.當接地線沿橋架全跨敷設時,各區段(包括非直線區段)應少與接地線有一個可靠的連接點。
  3. When the grounding wire is laid along the whole span of the bridge, each section (including non-linear section) shall have at least one reliable connection point with the grounding wire.
  以上是山東電纜橋架制造商為大家介紹的相關內容,想要了解更多內容,歡迎訪問網站:http://www.zkhtkj.cnThe above is the relevant content introduced by Shandong cable tray manufacturer. For more information, please visit the website: http://www.zkhtkj.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318