四虎最新影院 I 美女一区二区在线观看 I av不卡在线看 I 冲田杏梨 av作品在线 I 亚洲爆乳无码专区 I 特大色一区 I av综合av I 成人在线视频中文字幕 I 日韩精品免费在线视频 I 一级片黄色大片 I 99久久久无码国产精品试看 I 国内黄色小视频 I 91亚洲视频在线观看 I a久久久久久 I 午夜爽爽爽男女免费观看hd I 欧美 成人 亚洲 动漫 另类 I 四虎影院2019 I 肉耽高h男男1v1 I 成年片黄色日本大片网站视频 I 亚洲小说综合网 I 污的网站 I 波多野结衣中文字幕久久 I 又粗又猛又大爽又黄老大爷5 I 国产日产suv精品一区二区6 I 最新国产成人无码久久 I 欧美日韩一区二区精品 I 国产一区内射最近更新 I 巨粗进入警花哭喊求饶在线观看 I 污污网站观看 I 69国产精品成人 I 天堂а√中文最新版在线 I 2019精品视频 I 高贵麻麻被调教成玩物 I 精品国产精品网麻豆系列 I 韩国午夜小视频

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

濟(jì)南電纜橋架穿墻安裝要點(diǎn)有哪些

  說起濟(jì)南電纜橋架,很多人應(yīng)該很熟悉,電纜橋在我們的生活中是很廣泛的使用。你知道電纜橋架穿墻的關(guān)鍵點(diǎn)是什么嗎?安裝的注意事項(xiàng)是什么?帶你去了解,希望對你有所幫助!
  Speaking of Jinan cable bridge, many people should be familiar with it. Cable bridge is widely used in our life. Do you know what is the key point of cable bridge passing through the wall? What are the installation precautions? Take you to understand, hope to help you!
  1. 電纜橋架從所有正常的自然環(huán)境穿過墻體進(jìn)入防火、防爆型的自然環(huán)境,墻體應(yīng)安裝相應(yīng)的密封設(shè)備。
  1. The cable tray passes through the wall from all normal natural environment to enter the fire-proof and explosion-proof natural environment, and the wall shall be installed with corresponding sealing equipment.
  2. 當(dāng)電纜橋架從房間穿墻進(jìn)入室外時(shí),墻體兩側(cè)應(yīng)采取防水防雨措施。
濟(jì)南電纜橋架
  2. When the cable bridge enters the outdoor from the room through the wall, waterproof and rainproof measures shall be taken on both sides of the wall.
  3.當(dāng)電纜橋架從房間內(nèi)的墻壁安裝到室外較高的高度時(shí),電纜橋架應(yīng)傾斜增加適當(dāng)?shù)木嚯x,然后再進(jìn)行搭接,以滿足安裝標(biāo)準(zhǔn)。此外,應(yīng)避免沉淀,將電纜橋架注入室內(nèi)。
  3. When the cable tray is installed from the wall in the room to a higher outdoor height, the cable tray shall be inclined to increase the appropriate distance, and then the lap joint shall be carried out to meet the installation standard. In addition, precipitation shall be avoided and cable trays shall be injected into the room.
  4. 當(dāng)電纜橋架通過伸縮變形節(jié)時(shí),電纜橋架應(yīng)折斷。電纜之間的間距應(yīng)為100毫米
  4. When the cable bridge passes through the expansion deformation joint, the cable bridge shall be broken. The distance between cables shall be 100 mm
  設(shè)備關(guān)鍵點(diǎn)和常見問題
  Equipment key points and FAQs
  1.有線電視柜設(shè)備除了需要屏蔽安裝盾,為有線電視柜安裝在室外環(huán)境,應(yīng)該改裝罩頂部,避免太陽,因?yàn)槿绻阆氚惭b焊接時(shí),焊接,焊接厚不低于周圍的對接焊縫焊接部分,焊縫腐蝕的解決方案。
  1. In addition to shield installation shield, cable cabinet equipment shall be installed in outdoor environment. The top of cover shall be modified to avoid sun, because if you want to install and weld, the welding thickness shall not be less than the surrounding butt weld welding part and the solution of weld corrosion.
  2.裝配橋系列產(chǎn)品電纜橋架設(shè)備的大載荷支撐點(diǎn)間距應(yīng)小于允許載荷和支撐點(diǎn)間距。
  2. The distance between large load supporting points of cable bridge equipment for assembling bridge series products shall be less than the allowable load and the distance between supporting points.
  3.在選擇電纜橋架總寬度時(shí),應(yīng)預(yù)留一定的預(yù)留位置,方便日后加纜
  3. When selecting the total width of cable bridge, a certain reserved position shall be reserved for the convenience of adding cables in the future
  4.當(dāng)電線電纜與變頻電纜較少時(shí),可安裝在同一電纜橋架上,但中間應(yīng)將電線電纜與變頻電纜分開敷設(shè)。
  4. When there are less wires and cables and frequency conversion cables, they can be installed on the same cable bridge, but the wires and cables shall be laid separately from frequency conversion cables in the middle.
  5.電纜橋架水平敷設(shè)時(shí),電纜橋架中間的連接頭應(yīng)盡量設(shè)置在跨的上、下1/4處。水平電纜每隔兩米固定在跨度的上、下部分,垂直電纜每隔1.5米固定在跨度的上、下部分。
  5. When the cable tray is laid horizontally, the connector in the middle of the cable tray shall be set at the upper and lower 1 / 4 of the span as far as possible. The horizontal cable is fixed at the upper and lower parts of the span every two meters, and the vertical cable is fixed at the upper and lower parts of the span every 1.5 meters.
  6.電纜橋架設(shè)備應(yīng)有可靠的接地裝置。若以橋架為主接地線,每層橋架頂部應(yīng)接16mm2軟銅芯線(系列),并與主接地線通信,長途電纜橋架每隔30—50米設(shè)接地裝置。
  6. The cable bridge equipment shall have reliable grounding device. If the cable tray is the main ground wire, 16mm2 soft copper core wire (Series) shall be connected at the top of each layer of cable tray and communicate with the main ground wire. The grounding device shall be set every 30-50m for long-distance cable tray.
  以上是濟(jì)南電纜橋架穿墻的要點(diǎn)及安裝要點(diǎn)注意事項(xiàng),相信通過這篇文章的介紹,你可以對這座橋有一定的了解和了解,希望以上內(nèi)容能對你有所幫助。另外,如果你想了解更多相關(guān)信息,可以多關(guān)注我們的網(wǎng)站動態(tài)!
  The above is the key points of Jinan cable bridge through the wall and installation points. I believe that through the introduction of this article, you can have a certain understanding of this bridge, and hope that the above content can help you. In addition, if you want to know more about it, you can pay more attention to our website!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318