一级毛片私人影院老司机_嫩草国产_日日夜夜拍拍_韩日a级片_三级网页_久久久不卡网国产精品一区

網站公告-NOTICE

新聞資訊

當前位置:首頁 / 新聞資訊

電纜橋架驗收的要求標準

1)直線段鋼制電纜橋架長度超過30m、鋁合金或玻璃鋼制電纜橋架長度超過15m設有伸縮節;電纜橋架跨越建筑物變形縫處設置補償裝置
1) Expansion joint shall be set for straight section steel cable bridge with length more than 30m, aluminum alloy or glass fiber reinforced plastic cable bridge with length more than 15m; compensation device shall be set for cable bridge crossing deformation joint of building
(2)電纜橋架轉彎處的彎曲半徑,不小于橋架內電纜更小允許彎曲半徑,
(2) The bending radius of the cable tray at the turning point shall not be less than the minimum allowable bending radius of the cable in the tray,
更小允許彎曲半徑
Minimum allowable bending radius
1 無鉛包鋼鎧護套的橡皮絕緣電力電纜
1. Rubber insulated power cable with lead-free steel sheath
10D
10D
2 有鋼鎧護套的橡皮絕緣電力電纜
2. Rubber insulated power cable with steel sheath
20D
20D
3 聚氯乙烯絕緣電力電纜
3. PVC insulated power cable
10D
10D
4 交聯聚氯乙烯絕緣電力電纜
4. Cross linked PVC insulated power cable
15D
15D
5 多芯控制電纜
5. Multi core control cable
10D
10D
注:D為電纜外徑。
Note: D is the outer diameter of the cable.
(3)當設計無要求時,電纜橋架水平安裝的支架問距為1.5~3m;垂直安裝的支架間距不大于2m
(3) When there is no requirement in the design, the spacing between supports for horizontal installation of cable tray is 1.5-3m; the spacing between supports for vertical installation is not more than 2m
(4)橋架與支架間螺栓、橋架連接板螺栓固定緊同無遺漏,螺母位于橋架外側;當鋁合金橋架與鋼支架同定時,有相互問絕緣的防電化腐蝕措施
(4) The bolts between the bridge and the bracket and the bolts of the bridge connecting plate are fixed tightly without omission, and the nuts are located outside the bridge; when the aluminum alloy bridge and the steel bracket are the same, there are anti electrochemical corrosion measures for mutual insulation
(5)電纜橋架敷設在易燃易爆氣體管道和熱力管道的下方,當設計無要求時.與管{首的帚小海距.符合下表的規定
(5) The cable tray is laid under the flammable and explosive gas pipeline and thermal pipeline. When there is no requirement in the design, the small sea distance between the cable tray and the pipe {head shall meet the requirements in the following table
(6)敷設在豎井內和穿越不同防火區的橋架,按設計要求位置,有防火隔堵措施
(6) The cable tray laid in the shaft and passing through different fire zones shall be provided with fire prevention and blocking measures according to the design requirements
(7)支架與預埋件焊接周定時,焊縫飽滿;膨脹螺栓周定時,選用螺栓適配,連接緊同,防松零件齊全
(7) When the bracket and embedded parts are welded weekly, the weld is full; when the expansion bolt is welded weekly, the bolt is selected for matching, the connection is tight, and the anti loose parts are complete
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 天天色天天操综合网 | 99久久久久国产 | 久色视频 | 久久99精品久久久水蜜桃 | 91在线看| 国产精品一区二区三 | 香蕉tv国产在线永久播放 | 欧美黄色a | 国产成人夜色影视视频 | 午夜精品成人一区二区视频 | 性少妇chinesevideo| 看一级黄色毛片 | 国产中文字幕一区 | 欧美视频一区二区专区 | 亚洲免费成人 | 国产一区二区三区在线 | 99热久久精里都是精品6 | 婷婷亚洲国产成人精品性色 | 国产在线欧美精品 | 欧美高清在线观看视频 | 色博影院| 亚洲成人99 | 久久视频精品3线视频在线观看 | 中文字幕成人网 | 欧美高清一区 | 狠狠狠色丁香婷婷综合久久五月 | 国产线视频精品免费观看视频 | 午夜婷婷 | 开心激情综合 | 欧美一区二区三区免费 | 欧美一区永久视频免费观看 | 一区二区三区视频观看 | 欧美女孩videos | 欧美国产一级片 | 99reav| 久久视频精品 | 男女啪啪小视频 | 91约啪 | 在线免费观看黄色网址 | 一区二区三区高清不卡 | 国产精品久久久久久久久久妞妞 |