在使用橋架的時候需要掌握的知識

在有防火要求的區段內,可在電纜梯架,托盤內添加具有耐火或難燃性能的板,網等材料構成封閉或半封閉式結構,并采取在橋架及其支吊架表面涂刷防火涂層等措施。
In the section with fire protection requirements, the cable ladder and tray can be added with fire-resistant or flame-retardant plates, nets and other materials to form a closed or semi closed structure, and measures such as painting fire-resistant coating on the surface of the bridge and its supports and hangers can be taken.
整體耐火性能應滿足有關規范或標準的要求。在工程防火要求較高的場所.不宜采用鋁合金電纜橋架。
The overall fire resistance performance shall meet the requirements of relevant codes or standards. It is not suitable to use aluminum alloy cable tray in places with high fire protection requirements.
濟南電纜橋架
在使用橋架的時候需要掌握的知識
Knowledge to master when using bridge
當電力電纜和控制電纜較少時,可同一電纜橋架安裝,但中間要用隔板將電力電纜和控制電纜隔開敷設。
When there are few power cables and control cables, they can be installed on the same cable tray, but the power cables and control cables shall be laid separately with a partition in the middle.
選擇電纜橋架寬度時應留有備用空位,以便為今后增添電纜用。
When selecting the width of cable tray, spare space should be reserved for adding cables in the future.
電纜橋架裝置應有可靠接地。如利用橋架作為接地干線,應將每層橋架的端部用16mm2軟銅線聯接(并聯)起來,與總接地干線相通,長距離的電纜橋架每隔30--50米接地一次。
The cable tray device shall be reliably grounded. If the cable tray is used as the grounding main line, the end of each layer of cable tray shall be connected (in parallel) with 16mm2 soft copper wire to connect with the main grounding main line, and the long-distance cable tray shall be grounded every 30-50m.
電纜橋架水平敷設時,橋架之間的連接頭應盡量設置在跨距的1/4左右處,水平走向的電纜每隔2米左右固定一下,垂直走向的電纜每隔1.5米左右固定一下。
When the cable tray is laid horizontally, the connector between the cable trays should be set at about 1 / 4 of the span as far as possible. The horizontal cables should be fixed every 2 meters or so, and the vertical cables should be fixed every 1.5 meters or so.
電纜橋架裝置除需屏蔽裝保護罩外,在室外安裝時應在其加裝保護罩,防止日曬雨淋,對如需焊接安裝時,焊件四周的焊縫厚度不得小于母材的厚度,焊口應做防腐處理。
In addition to shielding and protective cover, protective cover shall be installed on the top layer of cable tray device during outdoor installation to prevent sunlight and rain. When welding and installation is required, the thickness of weld around the weldment shall not be less than that of base metal, and the weld joint shall be treated with anti-corrosion.
在橋架內橫斷面的填充率:電力電纜不應大于40%;控制電纜不應大于50%,對于弱電線路可到60%。
The filling rate of the cross section in the cable tray: the power cable shall not be more than 40%; Control cable should not be more than 50%, for weak current lines can reach 60%.
上面是橋架的相關知識,希望能對您有所幫助,更多內容可以直接關注:http://www.zkhtkj.cn
The above is the bridge related knowledge, I hope it can help you, more content can be directly focused on: http://www.zkhtkj.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 中文字幕伊人 | 日韩字幕在线 | 欧美激情精品久久久久久 | 男大当婚免费完整版视频 | 成年免费在线观看 | 国产午夜电影网 | 国产亚洲精品激情一区二区三区 | 欧美操操操 | 99精品一区二区三区 | 人人艹人人爽 | 山岸逢花在线观看 | 免费成人看片 | 亚洲精品免费日日日夜夜夜夜 | 亚洲欧美电影一区二区 | 国产高清视频在线观看 | 亚洲欧美日韩另类在线一 | 久久中文字幕电影 | jizz成人| 欧美69p| 国产欧美成人精品第二区 | 国产日韩免费观看 | 日韩av在线电影 | 免费观看成人碰视频公开 | 成年无码av片在线 | 国产成人亚洲影视在线 | www.meihuan.art | 国产精品夜夜爽范冰冰 | 人成精品 | 日本精品一区二区三区四区 | 91影院| 久久久无码人妻精品无码 | 五月色丁香综合成人网 | 婷婷在线视频观看 | 天天舔天天操 | 亚洲精品毛片一区二区三区 | 国产精品亚洲一区二区三区久久 | 久久在线视频 | 国产亚洲欧美在线 | 1000部精品久久久久久久久 | 天天干天天射天天舔 | 久草在线免费看视频 |