整套的電纜橋架的敷設安裝流程
在電纜橋架安裝完成后,就要進行電纜的鋪設,山東電纜橋架公司提示大家,電纜鋪設我們要進行檢查,嚴格按照規定程序進行,保證施工的質量和日后使用的可靠性。
After the installation of cable bridge is completed, cable laying should be carried out. Shandong Cable Bridge Company reminds you that cable laying should be inspected and carried out in strict accordance with the prescribed procedures to ensure the quality of construction and the reliability of future use.
一套合理的電纜橋架鋪設順序是這樣的:
A reasonable sequence of cable bridge erection is as follows:
1、測量定位,確定安裝橋架的支架安裝位置,經檢查確認支架合格后,才能安裝橋架;
1. Measure and locate the position of the bracket to install the bridge. After checking and confirming that the bracket is qualified, the bridge can be installed.
2、橋架安裝后也要經過檢查,只有合格后才能進行電纜的敷設;
2. After the installation of the bridge frame, it should also be checked. Only after qualified can the cable be laid.
3、對于電纜,在敷設前進行絕緣測試合格,才能敷設;


3. For cable laying, the insulation test is qualified before laying.
4、電纜電氣交接試驗合格,且對接線去向、相位和防火隔堵措施等檢查確認,才能通電。
4. Electrical connection test of cable is qualified, and check and confirm wiring direction, phase and fire-proof and blocking measures, etc. before power can be turned on.
以上的內容由山東電纜橋架公司友情提供,更多精彩內容請收藏我們的官網:http://www.zkhtkj.cn謝謝支持。
The above content is provided by the friendship of Shandong Cable Bridge Company. For more wonderful content, please collect our official website: http://www.zkhtkj.cn. Thank you for your support.
上一篇:電纜橋架安裝常見質量缺陷問題
下一篇:山東電纜橋架接地電阻的注意事項
下一篇:山東電纜橋架接地電阻的注意事項
相關文章 / Recommended news
- 濟南廠房福音!大跨距橋架破解3大痛點,加強筋加,安裝省一半錢
- 山東工程人警惕!橋架敷線踩這坑必返工,監理當場叫停,國標早有明確規定
- 濟南人避坑!橋架≠線槽,90%工程人都搞混,一字之差差千里
- 避坑指南!山東電纜橋架規格別瞎選,偏大浪費偏小隱患大,國標早就定好了
- 濟南人必看!鋁合金電纜橋架選對厚度,耐用又省心,90%的人選錯踩坑
- 山東人必看!電纜橋架不是“鐵架子”,藏著建筑用電的密碼,90%的人都不懂
- 800kg/m抗壓!濟南電纜橋架,破解3大工程痛點,工期省30%
- 3種類型+98%散熱!山東電纜橋架,選對不踩坑,布線效率翻倍
- 2類核心支架!濟南電纜橋架,抗震承重雙達標
- 別再混淆!山東電纜橋架vs線槽,6大核心區別一文分清
陽極氧化鋁合金橋架
托盤式電纜橋架
梯式電纜橋架
梯式不銹鋼電纜橋架
深灰色金屬防火電纜橋架